7 Yard Dirt & Concrete Box
12' × 8' × 2'
- HoldsAbout 10+ pickup truck loads of dirt
- WeightFlat rate, no overage
- Daily rentalNone
Dirt, sod, or concrete only. No household or construction debris. Details
Commercial accounts · Landscapers & Sod Removal
Sod removal, xeriscape conversions and re-grades generate heavy material fast. Our low-side 7-yard box hauls dirt, sod and concrete at a flat rate with no tonnage overage.
Our 7-yard dirt and concrete box sits two feet tall. A crew shovels or wheelbarrows straight in from ground level, and a skid steer bucket dumps over the side without lifting. It holds about 10 pickup-truck loads of dirt and hauls at a flat rate with no tonnage overage, which matters because dirt and sod are the heaviest material anyone puts in a container. Wet sod can run over a ton per cubic yard. In a standard roll-off with a tonnage allowance, a sod job is an overage waiting to happen. In the 7-yard, the price you book is the price you pay.
As a rule of thumb, a 7-yard box takes 800 to 1,200 square feet of sod depending on how much soil comes up with it and how the crew cuts it. A typical quarter-acre Salt Lake lot with turf front and back is somewhere between 3,000 and 5,000 square feet of lawn, which is three to five boxes. Most crews run two boxes on a swap: one filling while the full one goes to the dump, so nobody stops working. Tell us the square footage and whether you're cutting deep or shallow and we'll set the schedule.
The flat rate with no weight overage applies when the load is dirt, sod, or broken concrete or asphalt. Brush, branches, root balls, lumber, and bagged trash are mixed waste. If the load is mixed or the disposal facility reclassifies it, the flat rate no longer applies to weight, and it is billed with 2 tons included and $55 per ton over, from the scale ticket. There's no separate flat contamination fee and no return-trip charge for that reclassification. Wet soil from rain doesn't count as contamination. Green waste goes in the 20-yard; if a job produces both, order one of each and keep them separate.
We also bring material in. Fill dirt, topsoil, rock, and gravel delivered to the site for $175 flat, since there's no dump fee on the other end. Pair a live-load delivery with a 7-yard haul-away and the crew never leaves the property.
Landscapers and sod crews are most of our 7-yard volume, and most run Net 30 accounts at the contractor rate. Book by text, get the scale ticket with the invoice, and never explain a tonnage overage to a client again.

Dirt, sod, or concrete only. No household or construction debris. Details

No dirt, sod, gravel, brick, or concrete. Details
Contractor rate: one flat price per bin, no daily rental fee. Rates apply once your account is set up. Net 30 for commercial accounts. Commercial pricing details.
Keep them separate. Dirt, sod, and broken concrete or asphalt go in the 7-yard box at a flat rate with no weight overage. Brush, branches, and green waste go in the 20-yard. A mixed or reclassified 7-yard is billed with 2 tons included and $55 per ton over.
Rain isn't your fault. We don't treat wet soil as contamination.
Call 801-228-0661 or email [email protected]. Most accounts are live the same day.
Monday–Friday 8:00 AM – 5:00 PM. Same-day delivery on orders placed before noon.